漢杰橋架 - 專注于橋架的研發(fā)與生產(chǎn)
客戶統(tǒng)一咨詢熱線
15098828568
公司地址:一店:濟(jì)南市天橋區(qū)歷山路建華五金機(jī)電商場(chǎng)1FC-11 二店:濟(jì)南市歷城區(qū)北園路全福五金機(jī)電商場(chǎng)1058
文章來(lái)源:漢杰電纜橋架 作者:電纜橋架廠家 發(fā)布時(shí)間:2024-05-24 11:18:18 瀏覽次數(shù):0 山東電纜橋架在建筑工程中起著重要的作用,其施工質(zhì)量和安全關(guān)系到整個(gè)工程的質(zhì)量和安全。為了保證山東電纜橋架的施工規(guī)范,以下幾個(gè)工藝需要牢記并嚴(yán)格遵守: Cable bridge in Shandong plays an important role in construction
engineering, and its construction quality and safety are related to the quality
and safety of the whole project. In order to ensure the construction
specifications of Shandong cable bridge, the following processes need to be kept
in mind and strictly complied with: 1.
布置設(shè)計(jì):在施工前,需要對(duì)電纜橋架的布置進(jìn)行詳細(xì)的設(shè)計(jì),包括橋架的類型、規(guī)格、數(shù)量、位置等。設(shè)計(jì)應(yīng)考慮到電纜的種類、數(shù)量、敷設(shè)方式等因素,以確保橋架的合理使用。 1. Layout design: Before construction, the layout of cable bridge needs to
be designed in detail, including the type, specification, quantity and location
of the bridge. The design should take into account the type, quantity, laying
method and other factors of the cable to ensure the reasonable use of the
bridge. 2.
安裝固定:電纜橋架的安裝固定是一個(gè)關(guān)鍵步驟,需要嚴(yán)格按照設(shè)計(jì)圖紙進(jìn)行。橋架的固定方式有吊裝、支架、壁掛等,選擇哪種方式取決于實(shí)際情況。固定時(shí)應(yīng)確保橋架的水平和垂直,且連接牢固。 2. Installation and fixing: The installation and fixing of cable tray is a
key step, which needs to be carried out in strict accordance with the design
drawings. The fixed ways of the bridge include lifting, support, wall hanging,
etc. Which way to choose depends on the actual situation. When fixed, ensure
that the bridge is horizontal and vertical, and the connection is firm. 3.
電纜敷設(shè):電纜的敷設(shè)應(yīng)按照設(shè)計(jì)要求進(jìn)行,一般應(yīng)從電源端開(kāi)始,按照電纜的規(guī)格和類型進(jìn)行分層、分段敷設(shè)。電纜應(yīng)平整、緊密,不得有扭曲、壓迫現(xiàn)象。 3. Cable laying: Cable laying should be carried out in accordance with the
design requirements, generally from the power end, according to the
specifications and types of cables for layering, section laying. The cable
should be smooth and tight, without distortion or compression. 4. 連接接地:電纜橋架應(yīng)有良好的接地系統(tǒng),以保護(hù)電纜的安全。橋架的每個(gè)部分都應(yīng)接地,接地線應(yīng)采用銅線或銅帶,接地點(diǎn)應(yīng)清潔、牢固。 4. Connection grounding: the cable bridge should have a good grounding
system to protect the safety of the cable. Each part of the bridge should be
grounded, the ground cable should be copper wire or copper strip, and the ground
point should be clean and firm. 5.
檢查驗(yàn)收:施工完成后,應(yīng)對(duì)電纜橋架進(jìn)行檢查驗(yàn)收,包括橋架的安裝質(zhì)量、電纜的敷設(shè)情況、接地系統(tǒng)的完整性等。只有通過(guò)驗(yàn)收,電纜橋架才能投入使用。 5. Inspection and acceptance: After the construction is completed, the
cable bridge should be inspected and accepted, including the installation
quality of the bridge, the laying of the cable, and the integrity of the
grounding system. Only through acceptance, cable bridge can be put into use. 總的來(lái)說(shuō),山東電纜橋架的施工需要遵循以上幾個(gè)關(guān)鍵工藝,以確保其穩(wěn)定性和耐用性。同時(shí),施工過(guò)程中還應(yīng)注意安全操作,防止發(fā)生意外事故。只有這樣,電纜橋架才能發(fā)揮出預(yù)想的效益,為電力系統(tǒng)的安全運(yùn)行提供保障。 In general, the construction of cable bridge in Shandong needs to follow
the above key processes to ensure its stability and durability. At the same
time, attention should also be paid to safe operation during the construction
process to prevent accidents. Only in this way can the cable bridge bring into
play the expected benefits and provide protection for the safe operation of the
power system. 相關(guān)文章:山東電纜橋架
各位建設(shè)行業(yè)的家人們???♂????♀?,今天我們來(lái)揭秘一個(gè)對(duì)于保障基礎(chǔ)設(shè)施安全至關(guān)......
TIME:2024-05-30